Cooling Towers for Bologna Hospital

Cooling Towers for Bologna Hospital

The Major Hospital “Pizzardi” of Bologna installs as many as 12 non-corrodible and easy-to-maintain cooling towers to support the refrigeration units for the air conditioning system: performance and attention to noise level.

  • Maggiore Hospital "Pizzardi" of Bologna, serving 800,000 inhabitants
  • Supply of 12 silent and non-corrodible cooling towers for the air conditioning system
  • High performance for the high capacity required by the hospital facility
Azienda
"Pizzardi" Major Hospital of Bologna
Anno
2008
Localizzazione
Bologna, Italy
Tipologia interlocutore
Engineering firm
Campo di applicazione
Hospital facility (HVAC)
Storia in breve
At the time of the order, the Azienda Sanitaria Locale and the "Pizzardi" Hospital provided services to almost the entire Province of Bologna, totaling 800,000 inhabitants. In 2008, Hospital Body D was launched to rationalize and concetrate high-tech facilities into a single 17-story building.
Elenco delle esigenze del cliente
- Cooling of the refrigeration units of the air conditioning system in the Hospital's D-Body
- High performance
- Low noise levels
Fluido e temperatura in uscita
Thermal jump of 5°C
Potenze richieste
26 MW
Tecnologie fornite
No. 12 PME-E Silent open circuit cooling towers (concentrated in three condensation basins): anti-corrosion fiberglass structure, side doors for inspection of internal parts
Plus costruttivi
Silent version with low speed to keep noise down
La chiave del successo
Easy maintenance, low noise

1. Installation context

The new D-Body of Bologna’s Maggiore Hospital was conceived and built in 2008 as the facility’s “high-tech container.” The intervention included the construction of new areas, including emergency-urgency, trauma and surgical pathology, general medicine, geriatrics, obstetrics, gynecology and pediatrics.

The new air-conditioning system, conceived with the support of a specialized design firm, included several refrigeration units: machinery that, as a whole, needs considerable heat disposal capacity.

2. Proposed solution

MITA Cooling Technologies supplied as many as 12 PME-E Silent cooling towers for the cooling units of the new hospital facility: reduced fan speeds to keep noise down, fiberglass sandwich panels to ensure corrosion resistance. Side doors ensure easy maintenance to the internal parts.

The towers were installed in three condensing basins, with a total capacity of 22,500,000 kcalTh.

3. The key to success

MITA Cooling Technologies’ solution has helped ensure the efficiency and proper operation of the cooling system at Bologna’s Maggiore Hospital. Easy maintenance and low noise levels are elements that convinced the hospital’s partner engineering firm.

Ask for Information

Some MITA Projects

Tools to help you choose

Cooling Advisors

First goal: ask the right questions to the customer and involve him selecting the best cooler. We have been doing this since 1960.

Preliminary plant evaluation

The visit to the plant is a fundamental moment to find the right information on your needs, together with your technicians and the engineering firms involved.

Tailor-made design

Complete range of coolers and chillers, dozens of variants for each type, solutions for each application and important customizations: MITA's design is truly tailor-made.